29210-0-0911 Page 27
InstallationofVerticalInletBafe
The vertical inlet bafe is to be used only in a completely vertical vent
installation. The vertical inlet bafe can be used when the vertical
vent rise is between 10 feet and 40 feet. To maintain the yellow
ame in the main burner, purchase Vertical Inlet bafe, DVF-139
from your Empire Comfort Systems, Inc. distributor or dealer for
Simpson Duravent only.
In a vertical vent rise the ame on the main burner can be reduced
due to the drawing action from the ue exhaust pipe and the air inlet
pipe. A decrease in the height or the appearance of the yellow ame
may occur when the vertical vent rise is between 10 feet and 40 feet.
To enhance the yellow ame on the main burner, the vertical inlet
bafe can be attached to the direct vent high wind vertical top.
Please use the following steps to install the vertical inlet
bafe.
1. Place the vertical inlet bafe over the exterior of the air inlet
openings on the direct vent high wind vertical top.
2. There are three sections of air openings on the exterior of the
air inlet pipe.
To achieve the maximum amount of yellow ame the vertical
inlet bafe will cover-up three sections of air openings.
To achieve the minimum amount of yellow ame the vertical
inlet bafe will cover-up one section of air openings.
3. Attach vertical inlet bafe to the direct vent high wind vertical
top with (2) 3/8" hex-head screws provided with vertical inlet
bafe.
4. Installation of vertical inlet bafe is completed.
Parts List
Description
Part
Number
Quantity
Supplied
Vertical Inlet Bafe DVF-139 1
3/8" Hex-Head Screw R-2656 2
ReassemblyandResealingVentPipeSystem
Attach vent pipe to inlet and outlet vent adaptor on replace. Replace
the horizontal and vertical pipe lengths, elbows and horizontal or
vertical termination kit.
All vent system components lock into place by sliding the concentric
pipe section with four (4) equally spaced interior beads onto the
appliance collar or previously installed component end with four
(4) equally spaced indented sections. When the internal beads of
each starting outer pipe line up, rotate pipe section clockwise 90°
(approximately 3 inches). The vent pipe is now locked together.
Continue replacing components per the vent system conguration.
Be certain that each succeeding vent component is securely tted
and locked into the preceding component in the vent system.
ReassemblyandResealingGasAccumulationReliefSystem
GlassFrameAssemblyandCombustionChamber
Whenever the glass frame assembly is pivoted open by a delayed
ignition in the main burner, the glass frame assembly gaskets and
combustion chamber must be examined by a qualied service person
for damage. All damaged gaskets on the glass frame assembly and
combustion chamber must be replaced by a qualied service person.
If damage occurs to the combustion chamber, it must be replaced
by a qualied service person. Contact Empire Comfort Systems,
Inc. for replacement parts.
VerticalThroughtheRoofApplications(Figure38)
Your Gas Fireplace has been approved for:
a) Vertical installations up to 40 feet in height.
b) Two sets of 45 degree elbow offsets within these vertical
installations. From 0 to a maximum of 8 ft. a vent pipe can be
used between elbows.
c) Wall straps must be used to support offset pipe every 4'.
This application will require that you rst determine the roof pitch
and use the appropriate venting components.
C
L
24”MINIMUM
CLEARANCE TO
COMBUSTIBLES;
NATURAL OR
MAN MADE.
TYPICAL ROOF
SUPPORT
TYPICAL JOIST
SUPPORT
40’
(12.19 M)
MAXIMUM
8’ (2.44 M)
MAXIMUM
8’ (2.44 M)
MAXIMUM
45°
45°
Figure38
VERTICALTERMINATION(continued)
Comments to this Manuals