Empire P)-1 Owner's Manual Page 25

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 24
29210-0-0911 Page 25
NOTE: Termination cap should pass through the wall restop from
the exterior of the building. Adjust the termination cap to
its nal exterior position on the building.
WARNING: Termination cap must be positioned so that arrow
is pointing up.
Attach the termination cap with the four wood screws provided.
Before attachment of the termination, run a bead of silicone sealant
rated above 250°F on its outside edge too, so as to make a seal
to the exterior wall.
NOTE: Wood screws can and should be replaced with appropriate
fasteners for use on stucco, brick, concrete or other types
of siding.
CAUTION: If exterior walls are nished with vinyl siding (or materials
that could become discolored or warp), it is necessary to install a
vinyl siding standoff.
The vinyl siding standoff will be installed between the vent termination
and the exterior wall. (See Figure 35) This horizontal vent termination
bolts onto the at portion of the vinyl siding standoff, so an air space
will exist between the wall and the termination cap.
Figure 35
HORIZONTAL TERMINATION
Page view 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 47 48

Comments to this Manuals

No comments